// Summary Statement

Summary Statement

How my work demonstrates the Engineers Australia Stage 1 competency elements, with a link to the write-up for each.

ElementHow I demonstrate itEvidence
1.2
Procedural-level understanding of the mathematics, numerical analysis, statistics, and computer and information sciences
Derived small-signal models and discrete PID implementations for four DC-DC converters, working through PWM timer formulas, sample-time scaling and integral windup. Tuning PID control for four DC-DC converter topologies
1.3
In-depth practical knowledge and skills within specialist sub-disciplines of the practice area
Supported generator, transformer and control system works (GCB, CTs, DCS, PLC) during a 435 MW unit's annual outage. Inside a 435 MW generator outage: protection, controls and trip testing
1.5
Knowledge of engineering design practice and contextual factors impacting the practice area
Saw how safety and isolation, the return-to-service schedule, grid reliability and traceability shape engineering decisions on a generating unit. Inside a 435 MW generator outage: protection, controls and trip testing
2.1
Application of established engineering methods to complex engineering problem solving
Fault-found a dead Fanuc R-J2 robot controller methodically from the supply inwards, ruling out the rotary phase converter and isolator before finding a blown servo/PSU fuse. Fanuc Arc Mate 100i at home (build log)
2.2
Application of technical and practical techniques, tools and resources to well-defined engineering problems
Applied FEMM, Ansys HFSS, RMxprt and Maxwell 2D to bushing electrostatics, a dipole antenna and a 130 kVA generator design. FEM modelling in ELE5605: from bushings to generators
3.4
Professional use and management of information
Audited trip and protection testing documentation in PI ProcessBook and DBDoc and produced drawings and datasheets. Why maintained documentation matters: auditing trip-testing records
3.5
Orderly management of self, and professional conduct
Kept a daily diary log of my tasks throughout a months-long outage placement, keeping my work organised, reportable and accurately recorded. Why maintained documentation matters: auditing trip-testing records